The economics

Value at the factory. Returns at the project.

One contact technology, two potential economic benefits — with an asset-light licensing model designed to capture a share of the value created.

Illustrative utility-scale solar array with orderly module rows, service lanes and electrical infrastructure

Manufacturer economics

A small process change.
A material margin opportunity.

Our first-order reference case links incremental processing cost to greater selling value. Factory economics remain subject to pilot validation.

Additional selling value+$0.38per wafer
−
Incremental process cost$0.20per wafer
=
Incremental economic gain$0.18per wafer

Preliminary reference modelling rounds net economic gain to approximately $0.20 per wafer. This first-order estimate excludes interest and consumables; fully loaded cost requires industrial validation.

$10–13
Estimated additional margin per moduleCommercial scenario

Interactive project finance

What does more energy
mean for your returns?

Compare the same project footprint with an editable energy-yield scenario. Every return is calculated from annual cash flows.

Illustrative pre-tax model

Your project

MW
MWh/MW
€/MWh
%

Uplift is a separate scenario assumption. Reduce it if clipping or grid constraints prevent additional energy from being delivered.

Finance assumptions
€/kW
€/kW
years
%
%
%
years
€/kW

Fixed tariff and operating costs. Equal degradation in both cases. Fully amortising annual debt payments. No tax, incentives or terminal value.

Equity IRR: conventional 12.05%, SiVolt scenario 16.23%.
Modelled equity IRR25-year project
Conventional12.05%
SiVolt scenario16.23%

+4.17 percentage points at 80.0% debt

Year 1ConventionalSiVolt scenario
Generation1,700.0 MWh1,863.2 MWh
Revenue€68,000€74,528
Project IRR7.49%8.83%
Year-1 DSCR1.25×1.40×
Minimum DSCR1.17×1.31×
Additional Year-1 revenue€6,528

Project IRR difference: +1.34 percentage points.

Annual equity cash flow

ConventionalSiVolt scenario
Annual equity cash flow comparisonAnnual cash flows after debt service, excluding initial investment. Full figures are available in the cash-flow table below. Senior debt is retired after Year 15.0k29k58kSenior debt retired (Yr 15)Year 1Year 25EUR · after debt service

October 2026 Reference Model. The 9.6% uplift requires field validation; it is not derived from the cell-efficiency development target. The reference case assumes no incremental SiVolt project capex. Results are illustrative pre-tax scenarios, subject to project-specific validation.

SiVolt licensing economics

Recurring royalties.
Limited asset ownership.

Our commercial model focuses on long-term licensing royalties. We aim to license our contact technology and process know-how to manufacturers, with equipment integration supporting adoption.

Our model captures a portion of the value created while manufacturers fund their production assets and developers own the generating projects.

Rounded management scenario
$8–15M

Illustrative annual royalty revenue

At 1% adoption of the 700 GW/year TOPCon manufacturing capacity in our October 2026 Reference Model.

1% adoptionRecurring licensingGlobal manufacturing base

The range illustrates a 5% royalty on gross enabled revenue or net margin creation, using rounded management assumptions. Actual licence terms, adoption and economics remain subject to commercial agreements. October 2026 Reference Model.

The next conversation

Explore the value in your factory or project.

Request data room access